Skip to main content

disaster-recovery-planner

Plan, run and evaluate disaster recovery (PRA) and business continuity (PCA) exercises and validate RPO and RTO targets against evidence. Builds the business impact analysis (MTPD, RTO, RPO, MBCO), picks the recovery strategy (backup and restore, pilot light, warm standby, active-active), writes the exercise plan with injects and success criteria, computes achieved RTO and RPO from drill timestamps, and maps evidence to DORA art. 11, 12 and 24 to 26, ISO 22301, NIS2 and ANSSI guides, using AWS Backup, Elastic Disaster Recovery, Route 53 ARC, Aurora Global Database, Azure Site Recovery, Velero and database PITR.

When to use​

Use when the user asks to "plan a DR exercise", "run a failover test", "check our RTO and RPO", "write the business impact analysis", or must prove backups restore within target. In French "preparer un exercice PRA", "tester le plan de continuite", "valider nos RTO et RPO".

Inputs and tools​

The skill takes the request of the user in natural language: its frontmatter declares no argument. It declares no allowed-tools: the tools available are those of the agent that loads it, under the tool policy of the project.

Reference​

FieldValue
Namedisaster-recovery-planner
CategoryDevops
VersionNot declared
LicenceNot declared
Allowed toolsNot declared
Plugins-
Sourcecatalog/navin/skills/disaster-recovery-planner/SKILL.md
Digestsha256:bab2ffe4b6d6833d701b83e49294a8c47e16ea327104ba1566885419b9938b16
skill_md_digestsha256:e79092332ef110d1683a8f51ea1b58905493ddb76c1913c71c9f5e15eb3f6719
EmojiπŸ›Ÿ

Bundled files​

PathCount
catalog/navin/skills/disaster-recovery-planner/examples2
catalog/navin/skills/disaster-recovery-planner/references4
catalog/navin/skills/disaster-recovery-planner/scripts2

Frontmatter​

Every field of the SKILL.md frontmatter, with the value of the source:

FieldValue
namedisaster-recovery-planner
descriptionPlan, run and evaluate disaster recovery (PRA) and business continuity (PCA) exercises and validate RPO and RTO targets against evidence. Builds the business impact analysis (MTPD, RTO, RPO, MBCO), picks the recovery strategy (backup and restore, pilot light, warm standby, active-active), writes the exercise plan with injects and success criteria, computes achieved RTO and RPO from drill timestamps, and maps evidence to DORA art. 11, 12 and 24 to 26, ISO 22301, NIS2 and ANSSI guides, using AWS Backup, Elastic Disaster Recovery, Route 53 ARC, Aurora Global Database, Azure Site Recovery, Velero and database PITR. Use when the user asks to "plan a DR exercise", "run a failover test", "check our RTO and RPO", "write the business impact analysis", or must prove backups restore within target. In French "preparer un exercice PRA", "tester le plan de continuite", "valider nos RTO et RPO".
metadata.navin.emojiπŸ›Ÿ
metadata.navin.categorydevops